Greenfield Lateral – In Minnesota, Kirk Excavating constructed a 16-inch, 6,500-foot pipeline for Northern Natural Gas (Michels Corp. as general contractor).

Targa NGL – Located in Texas, Kirk Excavating installed a 20-inch, 3,057-foot pipeline for Targa (general contractor: N. Rock Solutions).

Mariner East II – In Pennsylvania, Kirk Excavating completed a 20-inch, 943-foot pipeline for Sunoco Logistics (general contractor: Precision Pipeline).

Sherwood to Mobley – In West Virginia, Kirk Excavating built a 20-inch, 905-foot pipeline for MarkWest (general contractor: Meridien Energy).

Dowagiac River Crossing – Near Niles, MI, Kirk Excavating installed a 22-inch, 2,554-foot pipeline for TransCanada (general contractor: Roberts Pipeline).

Nexus Pipeline – In Northwest Ohio, Kirk Excavating constructed a 36-inch, 1,142-foot segment for Nexus (Michels Corp. as general contractor).

Mariner East II – In Pennsylvania, Kirk Excavating completed a 20-inch, 2,887-foot pipeline for Sunoco Logistics (general contractor: Precision Pipeline).

Mariner East II – Another segment in Pennsylvania where Kirk Excavating installed a 20-inch, 3,988-foot pipeline for Sunoco Logistics (general contractor: US Trinity).

Mariner East II – Kirk Excavating also constructed a 16-inch, 1,355-foot pipeline for Sunoco Logistics in Pennsylvania (general contractor: US Trinity).

Mariner East II – In Wellsburg, WV, Kirk Excavating installed a 20-inch, 1,363-foot segment for Sunoco Logistics (general contractor: Welded Construction).

Inkster to Sarnia Rd – In Michigan, Kirk Excavating built an 8-inch, 3,014-foot pipeline for Sunoco (general contractor: Otis Eastern).

Holland Energy Park – In Holland, MI, Kirk Excavating installed a 10-inch, 3,500-foot pipeline for BPW (general contractor: Roberts Pipeline).

Mishler Rd Project – In Mogadore, OH, Kirk Excavating constructed a 5-inch, 525-foot pipeline for Sunoco (general contractor: Otis Eastern).

Marauder Phase 2 – In Powhatan, OH, Kirk Excavating completed an 8-inch, 2,332-foot pipeline for Rice Energy (general contractor: Integrity Kokosing).

L7222 Replacement – In Medina, OH, Kirk Excavating installed a 4-inch, 5,420-foot pipeline for Columbia Gas (general contractor: Integrity Kokosing).

Kokosing River Crossing – In Fredericktown, OH, Kirk Excavating constructed a 6-inch, 596-foot crossing for Kokosing (general contractor: Integrity Kokosing).

COWL Project – In Canton, OH, Kirk Excavating built an 18-inch, 1,944-foot pipeline for Marathon (general contractor: Independence Excavating).

GM Plant Project – In Defiance, OH, Kirk Excavating installed an 8-inch, 3,200-foot pipeline for Energy Transfer (general contractor: Roberts Pipeline).

Rockies Express – In Monroe, OH, Kirk Excavating completed a 6-inch, 1,170-foot pipeline for NTE (general contractor: Integrity Kokosing).

Blackhawk Gathering – In Beaver Falls, PA, Kirk Excavating constructed a 6-inch, 816-foot pipeline for Williams (general contractor: J-Wood Contracting).

Mariner East – In Eastern Pennsylvania, Kirk Excavating installed a 12-inch, 3,600-foot pipeline for Sunoco (general contractor: Aaron Enterprises).

Vectren Interconnect – In Vandalia, OH, Kirk Excavating built a 12-inch, 3,500-foot pipeline for Vectren (general contractor: Mid-Ohio Contracting).

Purdue University Project – In Indiana, Kirk Excavating installed an 8-inch, 3,000-foot pipeline for Columbia Gas (general contractor: Minnesota Limited).

Clarington Lateral – In Clarington, OH, Kirk Excavating constructed a 20-inch, 4,900-foot pipeline for Eureka Hunter (general contractor: J-Wood Contracting).

MarkWest Lateral – In Ohio, Kirk Excavating completed a 12-inch, 300-foot pipeline for MarkWest (general contractor: Sheehan Pipeline).

Utica Lateral – In Carroll County, OH, Kirk Excavating installed a 12-inch, 4,000-foot pipeline for Chesapeake (general contractor: Willbros).

Blue Racer Lateral – In Woodsfield, OH, Kirk Excavating built a 12-inch, 2,400-foot pipeline for Blue Racer (general contractor: Welded Construction).

TRK 1110 Submarine Cable Failure – In Wayne County, MI, Kirk Excavating replaced a 24-inch, 3,042-foot cable for DTE (general contractor: Corby Energy).